Wild Dunes construction answers to three separate layers of review — the City of Isle of Palms, the Wild Dunes Community Association's Architectural Review Board, and state OCRM regulation of the critical coastal line — and each imposes its own setback and elevation rules on the same lot.

The ARB Sets Its Own Setbacks, Not the City

Under Isle of Palms' Planned Residential District zoning, setbacks in Wild Dunes are established by the community's own Architectural Review Board rather than fixed city code — and those standards vary by sub-neighborhood, with some enclaves requiring steeper roof pitches and different building lines than the resort's general baseline. Confirm your specific parcel's ARB standards before finalizing a site plan.

Flood Elevation Requirements Are Unusually Strict

With the island split between FEMA's VE and AE flood zones, new construction must meet a design flood elevation of the higher of Base Flood Elevation plus one foot or 13 feet above mean sea level, and current city standards push minimum finished-floor elevation to 14 feet. Engineer-stamped V-zone certification is required on qualifying lots before permits are issued.

Tree Removal and Compliance Deposits Carry Real Teeth

Removing any protected tree six inches or larger without ARB approval can trigger fines of $1,000 to $4,000 per tree, and new single-family construction requires a $15,000 compliance deposit held until final ARB inspection. Factor these holds and the ARB's multi-step review process into your project timeline from day one.